Virtual Layout Tour
Pete's Viaduct
Otter Creek & Perry #38 leads a milk car and coach off of the OC&P onto GSN rails. Because of the location of the wye connection, the switch could not be built on Pete's Viaduct and had to be gauntleted to the other side!
Pete, a longtime Club member constructed this concrete viaduct to carry our mainline over our famous
river found in our River Scene. This is the second highest bridge on the GSN mainline. As you can
see in the photos, the bridge is 3 tracks wide. We are currently contemplating about the third track
vacancy, whether to leave it empty, put ties down to make it appear abandoned, or actually extend the
yard lead at the west end of Albatross Yard! The switch for Albatross Yard actually sits on the east
end of the bridge. Just west of this bridge is NR Tower and the interchange with our branchline.
Two CSX GP-35s pull a tank train west out of Albatross Yard onto the concrete viaduct.
As the train progresses westward, we take a reverse angle shot of the viaduct. Now you can see our famous River Scene. The branchline is on the fill to the left of the river.
Back to the Virtual Tour Main Page
Eastbound to Albatross Yard
Westbound to Norristown
Home
Top of Page
WHAT'S NEW? |
Site Map |
Contact Us |
Locate Us |
E-Mail List |
Copyright |
Privacy
Last Updated November 5, 2005